1. BRS Review
2. Test Plan Review
3. FRS Review and Reporting
4. Participating in Review Meetings.
5. Identifying the Test scenarios
6. Prioritizing the scenarios
7. Designing the Test cases.
8. Involving in Peer Reviews (Optional)
9. Sending the TCD to Lead for Lead Review
10. Refining the Design based on Peer/Lead comments (optional)
11. Getting the approval for the design from BA. (Baseline)
12. SRN study, understanding the scope.
13. DD study, Deploying the Build into Test Environment
14. Conducting Sanity
15. Proceeding with Functional Testing.
16. Defects Reporting
17. Getting the modified build from Development Team.
18. Re and Regression testing on the modified build.
19. Preparation for System test scenarios and performing System Testing. (Domain Experts)
20. Test Closure.